Dublin: +353 1 453 7903
Cork: +353 21 4879175

KBC Bank Cork

Location: KBC Bank Cork

Project Duration: 5 weeks

When: February - March 2013

Doyle Interior systems were contracted to supply and fit our Micra II system (Frameless double glazed demountable  System) over 3 floor of this historic building. As Specialist contractors to Jim Davis Construction, we fitted our double glazed frameless glass partitions. 

The System is 70mm or 100mm width, with a maximum height of 3 meters. Floor track, wall connection head track and integrated door systems. The glass is 12mm toughened.