Doyle Interior Systems

Doyle Interior Systems have just completed the installation of Ladies and Gent toilet and Shower room facility in Citi Bank Dublin 1. We were contracted to Globoserve Ltd to supply and fit the cubicle and locker systems.

The system used was our Schafer VK13 Systems Range. With it 13mm HPL panels and Stainless Steel Supports. Using the wide range of Coloured panel available. The Project Architects designed a vibrant installation which is friendly for the Visually impaired users.

 

Old Mill Barrow Street Finishing Stages

We have just returned to site this week. The builders have been doing a fantastic job laying the wood floors.

From our photos you can now see the Glass Pods are nearing completion.  We are now fitting the glass doors. The doors are have 12 toughened glass with opal laminate bonding. Each door will have a drop seal to assist in the sound reduction process.

Our Bruynzeel Interfinish glass pods is a fantastic modern touch to the Old Mill. Let us know what you think.

Continue Reading

Diabetes Ireland

Architect: Joe Mc Sweeney

Contract: July 2013 to August 2013, 6weeks

Project: To deliver a fit-out an office for Diabetes Ireland. Including power & data, Comms room. Consultation, rooms, offices, open plan work space and work station. And to move Diabetes Ireland from their old building

Continue Reading

Office in a Georgian Building

For those who know the problems of having your office in a Georgian / period building but want to remain in your building. The down sides are, High ceilings, Picture rails, high skirtings and the difficulty creating meeting room space that looks good. Or if the opportunity arises to expand to another area of your Period Building and you are undecided. We in Doyle Interior Systems can solve your problem.

Continue Reading